1
/
of
8
Vesgantti
Vesgantti 110.2" Boneless Sectional Couch with Curved Armrest, 6 in 1 Convertible Folding Sleeper Sofa Bed, Chenille Modular Sofa for Living Room, No Assembly Required, Beige, Right Facing Chaise
Vesgantti 110.2" Boneless Sectional Couch with Curved Armrest, 6 in 1 Convertible Folding Sleeper Sofa Bed, Chenille Modular Sofa for Living Room, No Assembly Required, Beige, Right Facing Chaise
Regular price
$1,019.99 USD
Regular price
$1,019.99 USD
Sale price
$1,019.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Brand: Vesgantti
Color: Beige
Features:
- 6-in-1 Convertible Folding Sofa Bed: Featuring a simple folding mechanism, the convertible sofa easily transforms into at least 6 modes: loveseat, L shaped sofa, foldable couch, lounger, queen & king guest bed. It combines style, comfort, and space-saving functionality in one smart design. The adaptive design allows you to reconfigure the sofa into various shapes that meets the needs of different occasions, such as naps, movie nights, friends' gathering or overnight guests etc.
- Ergonomic Comfort Design: This convertible couch with chaise features a fully foam-filled structure, 3 adjustable reclining angled backrest pillows, and curved armrests that follow your body's natural posture and deliver superior pressure relief and ergonomic support. Filled with resilient high-density foam that maintains shape and provides balanced support for sitting or sleeping. This sofa bed is an ideal choice for modern lifestyles.
- Sturdy & Durable: No separate metal or wooden frame needed — the foam core acts as both cushion and structural support, eliminating weak joints, loose screws, or wobbling legs. Non-slip bottom keep the couch bed securely in place on hardwood or tile floors, while preventing scratches and reducing noise during adjustment. This frameless, integrated design makes the sofa bed couch lightweight yet incredibly stable and is perfect for years of daily folding and unfolding
- Premium Chenille Fabric: The foldable couch is crafted from soft, skin-friendly chenille fabric, which is scratch-resistant, wrinkle-resistant and pill-resistant; ensuring long-term durability and making it perfect for daily use. The tightly woven surface is pet-friendly — fur, dirt, and scratches are easily cleaned with a lint roller or damp cloth, keeping your sofa looking fresh (Note: Colors may vary slightly due to lighting or monitor settings)
- No Assembly Required: No tools or complicated setup are required. Our boneless couch bed is compressed and vacuum-packed; just simply unfold, adjust to your preferred configuration, and wait 72 hours for full recovery. The foldable sofa bed is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us
model number: Somnus Fold
Part Number: Somnus Fold
EAN: 0840452647022
Package Dimensions: 45.7 x 17.3 x 17.3 inches
Share
